Service

EHV Transmission Lines

EPC of 33 kV to 220 kV overhead lines — new lines, LILOs and evacuation lines — on S/C, D/C and M/C towers, on turnkey basis.

Overview

Transmission lines are the core of Hem Engineers’ work. We execute overhead lines on an EPC and turnkey basis — from survey and route approval through supply, erection, testing and commissioning — for utilities, renewable developers, railways and EPC partners.

Scope of work

  • New single-circuit (S/C), double-circuit (D/C) and multi-circuit (M/C) tower lines
  • LILO (loop-in loop-out) of existing lines at new and existing substations
  • Power-evacuation lines from solar, wind and hybrid plants
  • Supply lines to railway traction substations (TSS)
  • Supply, erection, testing and commissioning on turnkey basis

Related projects

View all 29 related projects

220 kV

Ongoing

Waghodiya (PGCIL) – Vyankatpura Line LILO

Client
GETCO
Voltage
220 kV
Length
30.86 km
Scope of work

220 kV LILO to proposed 220 kV Halol substation from the existing 220 kV D/C Waghodiya (PGCIL) – Vyankatpura line no. 1 with AL-59 conductor and 48F OPGW cable, on turnkey basis.

  • Transmission line

220 kV

Ongoing

Otha – GPPC Line No. 1 & 2

Client
GETCO
Voltage
220 kV
Length
21.036 km
Scope of work

220 kV D/C Otha – GPPC Line No. 1 & 2 on D/C towers with ACSR Zebra conductor and GI earthwire (7/3.15 mm), on turnkey basis.

  • Transmission line

220 kV

Ongoing

Rajula (Sintex) LILO

Client
GETCO
Voltage
66 kV / 220 kV
Length
15.00 km
Scope of work

66 kV LILO to 220 kV Rajula (Sintex) substation from the existing 66 kV Dedan – Mota Barman line on D/C towers with ACSR Panther conductor, on turnkey basis, under the Kisan Suryoday Yojana.

  • Transmission line

220 kV

Completed

Surel Solar Park

Client
Torrent Power
Voltage
220 kV
Length
41.00 km
Also
1 no. substation
Scope of work

EPC of 220 kV S/C line from Surel Solar Park to GETCO Bechraji substation, along with 1 no. substation.

  • Transmission line
  • Substation & bays
  • Renewable evacuation

220 kV

Completed

220 kV Palanpur – Kheralu Line

Client
GETCO
Voltage
220 kV
Length
12.626 km
Scope of work

EPC of 220 kV D/C Palanpur – Kheralu line at proposed 220 kV Sisrana (Satlasna) substation on D/C & M/C towers with AL-59 conductor and 48F OPGW cable.

  • Transmission line

220 kV

Completed

Shikarpur WF – Samakhiyali Line

Client
GETCO
Voltage
132 kV / 220 kV
Length
12.590 km
Scope of work

EPC of 132 kV D/C Shikarpur WF – Samakhiyali line at 220 kV Vondh S/S on 132 kV D/C & 220 kV M/C towers with ACSR Panther conductor and OPGW cable.

  • Transmission line
  • Renewable evacuation

Start a project

Planning a transmission, substation or cabling project?

Talk to our team about scope, approvals and execution — from GETCO feasibility through to final CEIG clearance.

  • 26+Years in EHV EPC
  • 31Projects completed
  • 25Clients served